Tabel |
6.1 |
|
Daya Terpasang,
Produksi, dan Distribusi Listrik PT. PLN (Persero) pada Cabang/Ranting PLN
Menurut Kecamatan di Kota Semarang, 2020 |
|
Table |
|
Installed
Electricity Power, Production, and Distribution of PT. PLN (Persero) at
Branch Level by Subdistrict in Semarang Municipality, 2020 |
|
|
|
|
|
|
|
|
|
Cabang/Ranting |
Daya Terpasang |
Produksi Listrik |
Listrik Terjual |
Dipakai Sendiri |
Susut/Hilang |
Branch/Sub-branch |
Installed Capacity (MVA) |
Electricity Production (MWh) |
Electricity Sold (MWh) |
Own Usage (MWh) |
Shrinkage/Lost (MWh) |
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
Semarang Utara |
537 059,35
|
883 392,70
|
849 576,08
|
- |
33 816,62 |
Semarang Barat |
476 039,30
|
867 178,75
|
832 314,85
|
- |
34 863,90 |
Semarang Timur |
497 027,20
|
969 517,67
|
893 338,49
|
- |
76 179,19 |
Semarang
Selatan |
237 255,45
|
371 948,84
|
355 659,51
|
- |
16 289,33 |
Kota Semarang |
1 747 381,30 |
3 092 037,96 |
2 930 888,92 |
- |
161
149,04 |
|
|
|
|
|
|
|
Catatan/Note: |
... |
|
|
|
|
|
Sumber/Source: |
PT PLN (PERSERO)
Wilayah Kota Semarang/Regional PT PLN (PERSERO) of
Semarang Municipality |
|
|
|
|
|
|
|
|
|